Wallumbilla 2
Wallumbilla 3

Wallumbilla Eastern Haul SMPE&I Works

Wallumbilla, Queensland

Background

The Eastern Haul project upgrade works were undertaken to enable bi-directional flow of the existing South West Queensland (SWQ) pipeline system. The scope included brownfields tie-in work to the existing Wallumbilla Meter Station (WMS), Compressor Station No. 1 (WCS1) and Compressor Station No. 2 (WCS2).

Client

APA Group

Challenges

The upgrade works involved a significant modification and upgrade to the existing Wallumbilla Meter Station (WMS), Compressor Station No. 1 (WCS1) and Compressor Station No. 2 (WCS2). All three (3) facilities were required to remain operational throughout construction resulting in a number of complex brownfields shutdowns and tie-ins to the existing facilities.

Advantages

Valmec rationalised sixteen (16) shutdowns down to five (5) via comprehensive revised strategy planning. Our direct employed blue collar workforce having extensive experience in the gas compression and transmission industry, provided sound knowledge of the work required to execute and ensure no unplanned outages or shutdowns to this critical piece of gas transmission infrastructure.

Get in touch

Talk to us about your next project
1300 VALMEC or