DBP 2
DBP 1

DBP - High Pressure Gas Turbine (HEGT) Pressure Service

Kwinana Junction DBP Facility

Background

Valmec Australia was awarded the Structural, Mechanical, Piping Fabrication, Electrical & Instrumentation (SMPE&I) Installation contract for the High Efficiency Gas Turbine (HEGT) Pressure Service project. The scope consisted of installing new Pressure Control Valves at the reactivated M2B meter run at the Kwinana Junction pipeline facility owned by DBP. The purpose of the upgrade was to provide supplementary high pressure gas from CS10 discharge directly to the Kwinana West Lateral to maintain the required minimum pressure of 3850 kPa at the inlet to the HEGT Meter Station.

Client

DBP

Challenges

Obtaining key material components in the short project time frame.

Advantages

With extensive experience in the gas compression and transmission industry, Valmec staff performed all works in house, cost effectively whilst ensuring production asset integrity and operational contractual requirements were maintained.

Get in touch

Talk to us about your next project
1300 VALMEC or