Background

Valmec was awarded the contract to design, procure, fabricate and install temporary equipment and pipe spools required to conduct the integrity assessment of the MGL Pipe Line.  The selection, coordination and management of a Pigging specialist subcontractor, for running gauge pig (GP) and intelligent pig (IP) to assess the condition of the pipeline was included in the scope of work.

Client

ATCO Gas

Challenges

There was a strict time frame for project execution to ensure no lost revenue to the client. The integrity assessment under ATCO’s pipeline licence required the project to be completed in less than three (3) months.

Advantages

Valmec provided an integrated management team that executed the project requirements within the strict time frame provided with minimal support from the clients team. Integrity analysis by the intelligent PIG was conducted safely and satisfied the clients expectations and requirements.

Get in touch

Talk to us about your next project
1300 VALMEC or