Background

Stage 2 of the land development that included providing services to 52 lots. The site needed to be cleared and earth worked. The site conditions required significant amount of imported fill which was brought in from off site. Underground services were installed throughout the site, these included sewer, stormwater, power, gas, communication and water.  Limestone retaining walls were installed across the development. Finally, roads were constructed to complete the development.

Client

DC Tyler

Challenges

Dust control was a significant challenge for the site team.  The controls included not only traditional dust monitoring and water carts but also liaison with local residents to ensure that controls were effective. Additional challenges included management of the import of fill and the isolation of existing clay subsoils.

Advantages

VALMEC offered the benefit of experience with the soil conditions and years of land development construction. VALMEC also offered a proactive approach to the project challenges.

Get in touch

Talk to us about your next project
1300 VALMEC or