Baldivis 2
Baldivis 3
Baldivis 1

Baldivis Booster Pump Station - Makin Road

Perth, WA

Background

The water booster pumping station required the Contractor to build a brick veneer steel framed building with colorbond roof and fitout with all mechanical pumping equipment, electrical and pumps. The Contract also required the construction of water reticulation mains to the pump house and ancillary site works such as roadway, fencing, stormwater drainage and erosion control rock pitching.

Client

Dividing Hill Pty Ltd

Challenges

All the brownfields construction works had to be completed under very strict timeframes so that commissioning could take place and new lots could receive titles. The restricted site made working on multiple work fronts challenging. Very precise planning was required to co-ordinate multiple trades.

Advantages

Valmec provided strong leadership during the project and as a result were able to complete the tasks with the technical knowledge to eliminate interface gaps. The project was well suited to the organisation in that Valmec was able to self-perform a wide range of the work with only specialist functions being outsourced or subcontracted.

Get in touch

Talk to us about your next project
1300 VALMEC or