Urban Development

Harvest Lakes Stages 11A and 12B

Background

This Landcorp project was consulted on by consulting engineers Tabec, located in the quickly developing south metro area of Atwell, Perth. The project involved 2 phases for Stage 11, of which the works of some 60 lots required all site works to be completed. These included bulk earthworks, retaining walls, roadworks, stormwater drainage, sewerage, water reticulation and services.

Get in touch

Talk to us about your next project
1300 VALMEC or